EV Home & Commercial Chargers for electric vehicle owners in Bristol
The installer has to check that the property's supply can take the extra load. That means looking at the main fuse rating, existing demand from electric showers, cookers and heat pumps, and whether the supply is shared with a neighbour, which some older properties have. Many installations use load management that slows charging when the house is drawing a lot of power. The local distribution network operator must be told about a new chargepoint, and in some cases it will need to upgrade the fuse or separate a shared supply before or after installation.
Earthing is the technical detail most worth asking about. Many British homes have a PME earthing arrangement, and BS 7671 requires protection against the risk of a broken neutral conductor when a vehicle is charged outdoors. That protection can be built into the chargepoint or provided by a separate earth electrode, and the installer should explain which approach they propose and why. The circuit also needs suitable RCD protection, which is sometimes built into the charger. The test results should be recorded on the certificate.
